About Imatech
|
Supplier Links
|
Cart
|
Contact Us
Home
Products
Case Histories
Order Online
Case Study
Industrial Corrosion & Abrasion
Mine Backfill Solutions
Water Treatment and Filtration
Ultra-Resistant Wear Liners
Weigh Hopper, Steel Works
Transfer Chute, Steel Works
Head Chute Dead Bed, Nickel Processing
Tertiary Crusher Feed Bins, Iron Ore
SAG Mill Discharge Chute, Nickel
Port Loading Facility, Iron Ore
Apron Feeder Chute
Transfer Chute, Iron Ore
Iron Ore & Coal Transfer Chute
Reclaimer, Centre Chute
Non-Slip Safety Surfaces
Pump Refurbishment & Improvement
Head Chute Dead Bed, Nickel Processing
Industry
Nickel Processing Plant
Site
Leinster, WA
Application
CV 55 Head Chute
Problem Description
Bisalloy liners replaced every 6 weeks.
100mm Polyurethane replaced every 2 weeks.
Imatech Solution
In consultation with Imatech, CE and the fixed plant supervisor, a dead bed shelf design was implemented.
The Results
The dead bed shelf and CorroCube liners were installed in one shift by 2 men.
The shelf was filled with lump ore and fines prior to operation start up.
After 3 days of operation and observation, the shelf was performing as designed.
The client commented that - it looks like rock hitting a pillow”.
Search
Website Development by The Pagesmith
COPYRIGHT © 2010 IMATECH ABN 49 063 145 960
TOLLFREE (+61) 1800 352 228 PHONE (+61) 02 8853 3000
CONTACT IMATECH
|
IMATECH POLICIES & TERMS
Credit Card Processing
Payment Gateway
E-Commerce