Case Study

 


Transfer Chute, Steel Works


Industry
Steel Works

Site
NSW, Australia

Application
Conveyor Transfer Chute

Problem Description
Original liner material wore out before 18-weekly scheduled maintenance shutdown, causing unscheduled shuts, disruptions and high costs

Imatech Solution
A 5 year comparative test was carried out to determine the best liner solution:

The Results
Based on the apparent wear patterns after change-out at 62 weeks, Imatech has reviewed the design to further extend the total wear-life. The current target is to achieve a 72-week wear life, coinciding with every 4th shut.


 

 
   
 