About Imatech
|
Supplier Links
|
Cart
|
Contact Us
Home
Products
Case Histories
Order Online
Case Study
Industrial Corrosion & Abrasion
Mine Backfill Solutions
Water Treatment and Filtration
Ultra-Resistant Wear Liners
Weigh Hopper, Steel Works
Transfer Chute, Steel Works
Head Chute Dead Bed, Nickel Processing
Tertiary Crusher Feed Bins, Iron Ore
SAG Mill Discharge Chute, Nickel
Port Loading Facility, Iron Ore
Apron Feeder Chute
Transfer Chute, Iron Ore
Iron Ore & Coal Transfer Chute
Reclaimer, Centre Chute
Non-Slip Safety Surfaces
Pump Refurbishment & Improvement
Weigh Hopper, Steel Works
Industry
Steel Works
Site
NSW, Australia
Application
Weigh Hopper
Problem Description
Ni-Hard liners lasting less than 22 weeks, causing unscheduled shuts between routine shutdowns.
Imatech Solution
CorroCube Ceramic Liners made to the existing liner shapes were installed in the heaviest impact area in the weigh hopper.
The Results
The CorroCube Liners are cost effective at 66 weeks (3 shuts) on liner-only cost basis. Savings in change-out cost a major bonus! The top row will be changed at 110 weeks (5 shuts) while the rest will stay in service until at least the 132 week shut (6 shuts).
Search
Website Development by The Pagesmith
COPYRIGHT © 2010 IMATECH ABN 49 063 145 960
TOLLFREE (+61) 1800 352 228 PHONE (+61) 02 8853 3000
CONTACT IMATECH
|
IMATECH POLICIES & TERMS
Credit Card Processing
Payment Gateway
E-Commerce